April, May building progress
Hi All,
Just to prove that I have not fallen off the wagon again. I have loaded a couple more time-lapse videos to You-tube in order to illustrate my slow steady progress. Elevators installation, pitot system installation, and fabrication and installation of a new design for the canard root, should increase the elevator efficiency and cut down on drag at the elevator/fuselage intersection. Links are: http://youtu.be/mDo6t2kM5VM and http://youtu.be/00J2hVNqEPs Cheers, Jay Scheevel -- Tri-Q still building. |
|